Q201). The process of working a flat for the finishing coat, is known
a).Dubbing out
b).Floating
c).Knitting
d).Blistering
Correct Answer:
Floating
Explanation:
Q202). The highest line of sloping roof, where two opposite slopes meet, is known as
a).Rafter
b).Ridge
c).Crown
d).Eave
Correct Answer:
Ridge
Explanation:
Q203). The depth of the ground water table may be ascertained by
a).Looking through the well in the vicinity
b).Standing on the well in the vicinity
c).Measuring the depth of water in the well
d).None of the above
Correct Answer:
Measuring the depth of water in the well
Explanation:
Q204). Which of the following metal sheets is most effective in preventing dampness?
a).Copper sheets
b).Lead sheets
c).Aluminium sheets
d).All the above
Correct Answer:
All the above
Explanation:
Q205). Under reamed piles are generally used for
a).Machine foundations
b).Factory building
c).Tall structures
d).All the above
Correct Answer:
All the above
Explanation:
Q206). (A) Machine foundations
a).(A)
b).Machine foundations
c).
d).
Correct Answer:
Explanation:
Q207). (B) Factory building
a).(B)
b).Factory building
c).
d).
Correct Answer:
Explanation:
Q208). (C) Tall structures
a).(C)
b).Tall structures
c).
d).
Correct Answer:
Explanation: